Ready for the next step?
Contact us to discuss your project.
Company
Live compliance data from the
ScaffDocs
platform · scaffdocs.co.uk
SCAFF
DOCS
Loading scaffold design…
⚙ Configure
←
Back to 3D model
Scaff
Docs
· 3D
Front
Corner
Side
Top
Building
Show building
Wall
Brick
House front
Shop front
Warehouse
Industrial unit
Rendered
School
Modern office
Factory
Hotel
Container offices
Flats / apartments
New build (under construction)
Roof
Pitched
Flat
Public pavement
On
F
Front
Re
Rear
L
Left
Rt
Right
Footway width
2.0 m
Kerb & road
Parking bays
F
Front
Re
Rear
L
Left
Rt
Right
Kerb timber
F
Front
Re
Rear
L
Left
Rt
Right
Double yellows
F
Front
Re
Rear
L
Left
Rt
Right
Dimensions
Length
12.0 m
Height
8.0 m
Bay
2.0 m
Lift height
2.0 m
2.0 m
2.7 m
First lift
2.0 m
2.0 m
2.7 m
Side length
6.0 m
Boards & lifts
Main boards
5
Inside boards
2
Boarded lifts
all
Elevations
All elevations
Left return
Right return
Rear elevation
Ladder access
Front
at bay
auto
Left return
— needs left return
at bay
auto
Right return
— needs right return
at bay
auto
Rear
— needs rear elevation
at bay
auto
Add-on scaffolds
Access tower
Tower length
2.4 m
3.0 m
Tower width (boards)
5
Side
Front
Rear
Left
Right
Position along side
50%
Tower netting
Roof edge protection
(flat roof only)
Mounting
Roof-based
Wall-drilled (tie bars)
Freestanding base-out
Netting
Toe board
Chimney stack scaffold
Temporary roof
Roof safety rail (solar panels)
Gable lifts
0
(needs a return)
Loading bay
Bay length
2.0 m
Bay position
–
Bay width
1.5 m
Scaffold lorry
Show scaffold lorry
The lorry parks on the road, so the elevation it is parked on needs
Building › Public pavement
switched on for that side.
Turn the pavement on for this side
Parked on
Front
Rear
Left
Right
Position along
50%
Livery text
Scaffold load
Ratchet straps
Stanchions
Dropsides
Mesh headboard
Side underrun guards
Livery panel
Protection
Fan
off
Fan on
F
Front
Re
Rear
L
Left
Rt
Right
Sheeting
None
Debris netting
Monarflex sheeting
Sheet scaffold (all elevations)
Sheet from lift
1
Sheet temporary roof
— needs temp roof
Debris netting
On
F
Front
Re
Rear
L
Left
Rt
Right
Leg protection foam
Foam on
F
Front
Re
Rear
L
Left
Rt
Right
Tw
Tower
Material handling
Rubbish chute
Chute on
F
Front
Re
Rear
L
Left
Rt
Right
Gin wheel & rope
Gin on
F
Front
Re
Rear
L
Left
Rt
Right
Waste skip
Skip on
F
Front
Re
Rear
L
Left
Rt
Right
Beam bridge
None
Ladder beam (360)
450 Alloy beam
750 Asterix beam
Beam on
F
Front
Re
Rear
L
Left
Rt
Right
Start bay
F
Front
1
Re
Rear
1
L
Left
1
Rt
Right
1
Bridge span (bays)
F
Front
3
Re
Rear
3
L
Left
3
Rt
Right
3
Beam at lift
F
Front
1
Re
Rear
1
L
Left
1
Rt
Right
1
Gantry
Pavement gantry
Gantry on
F
Front
Re
Rear
L
Left
Rt
Right
Gantry length
6.0 m
Gantry position
–
Gantry width — span over pavement
2.0 m
Gantry height (beam top)
2.0 m
Beam spacing
1.0 m
Beam depth
450 Alloy beam
750 Asterix beam
Rear beam bridge — drop the towers over an obstruction
None
450 Alloy beam
750 Asterix beam
Bridge start
1
Bridge span
2
drag to orbit · pinch / scroll to zoom
Loading design…
Drag to rotate · pinch to zoom · tap for details
▾
Scaffold
Standard
TG20:21 compliant
Duration
—
Quote ref
Prepared for
📞 Call us
WhatsApp
Interactive design · powered by
ScaffDocs